Construction — Alps
Construction begins on vertical solar project in the Alps
Alps Construction solar project
Construction begins on vertical solar project in the Alps The 2.2 MW vertical solar plant, built on a dam wall at an altitude of almost 2,500 meters above the sea level, is expected to be commissioned within four months. The 2.2 MW project is being built at an altitude of almost 2,500 meters above sea level. Switzerland-based energy company Axpo and power provider IWB announced that construction began on the 2.2 MW vertical PV system they have planned for the Muttsee dam in the Swiss Alps, at an altitude of almost 2,500 meters above sea level. Axpo said it secured...